Tag Archives: Brent Pipeline System

TAQA’s Brent System Pipeline Down For Two Weeks in Oct 2016

Brent Pipeline System is scheduled for a two weeks maintenance in October 2016.

TAQA is the operator of the Brent Pipeline which connects its operated Cormorant Alpha platform back to the BP-operated Sullom Voe Terminal. The Brent System Pipeline carries approximately 90,000 bpd of oil, or approximately 10% of the UK’s oil production.

Send to Kindle